PP Reducing Tee

Item Code Description Unit Weight (g)
CFRT2520 PP Reducing Tee 25x20mm (Italian Plast) 0.130
CFRT3220 PP Reducing Tee 32x20mm (Italian Plast) 0.190
CFRT3225 PP Reducing Tee 32x25mm (Italian Plast) 0.205
CFRT4020 PP Reducing Tee 40x20mm (Italian Plast) 0.345
CFRT4025 PP Reducing Tee 40x25mm (Italian Plast) 0.355
CFRT4032 PP Reducing Tee 40x32mm (Italian Plast) 0.365
CFRT5025 PP Reducing Tee 50x25mm (Italian Plast) 0.500
CFRT5032 PP Reducing Tee 50x32mm (Italian Plast) 0.515
CFRT5040 PP Reducing Tee 50x40mm (Italian Plast) 0.580
CFRT6325 PP Reducing Tee 63x25mm (Italian Plast) 0.820
CFRT6332 PP Reducing Tee 63x32mm (Italian Plast) 0.840
CFRT6340 PP Reducing Tee 63x40mm (Italian Plast) 0.960
CFRT6350 PP Reducing Tee 63x50mm (Italian Plast) 0.950
CFRT7540 PP Reducing Tee 75x40mm (Italian Plast) 1.090
CFRT7550 PP Reducing Tee 75x50mm (Italian Plast) 1.150
CFRT7563 PP Reducing Tee 75x63mm (Italian Plast) 1.250

Description

Code Size Code Size
RT001 25mm x 20mm RT002 32mm x 20mm
RT003 32mm x 25mm RT004 40mm x 20mm
RT005 40mm x 25mm RT006 40mm x 32mm
RT007 50mm x 25mm RT008 50mm x 32mm
RT009 50mm x 40mm RT010 63mm x 25mm
RT011 63mm x 32mm RT012 63mm x 40mm
RT013 63mm x 50mm RT014 75mm x 50mm
RT015 75mm x 63mm RT016 90mm x 50mm
RT017 90mm x 63mm RT018 90mm x 75mm
RT019 110mm x 63mm RT020 110mm x 75mm
RT021 110mm x 90mm

COMPRESSION FITTINGS ASSEMBLY INSTRUCTIONS

PIPE PREPARATION & CAP UNSCREW:

Cut the pipe round and square and remove the burrs; better to chamfer greater than 75mm. Unscrew the Cap to the last thread, leave it on the fitting while inserting the pipe.

PIPE INSERTION UP TO THE FIRST PIPE STOP:

Twist the pipe into the fitting through the grip ring till the first stop: the pipe has reached the O Ring. Pipe insertion up to the first pipe stop. Balance sealing system. The O Ring has two. opposite lips that allow easier pipe insertion. The right placement of the O Ring in the body round to avoid twisting. The better adaptability of the Ring towards the body and the pipe wall. (large contact pipe surface)

PIPE INSERTION UP TO THE BODY PIPE STOP:

Push the pipe through the gasket till the second stop, you have reached the pipe stop ribs of the fitting. Balancing of O Ring
The radial body site and the conical gasket are designed to keep the gasket lightly up in the site: after the pipe insertion it doesn’t reach directly the body pipe stop, it also remains a little raised from the pipe stop thanks to the internal ribs in the body.

SCREWING THE CAP:

Tighten the Cap firmly by hand or standard tool up to 20-32mm, and by standard Pipe wrench for greater than 40mm; the pipe moves to the very final body stop.

Balancing of O Ring:

By tightening the Cap it works on the thrust ring that push the O Ring, meanwhile the pipe is moving to the final stop in the body: the O Ring can deeply place in its site also moving radially and increasing its compression towards the pipe wall, as much as it’s possible in relation to the dimensional. In this way, acting on the tightening level of the Cap, it is possible to realize a system able to balance pipe defects such as undersize and ovality in standard

DISCOVER OUR PRODUCTION LINE

Click here to watch an exclusive video tour of our state-of-the-art production line and factory. See firsthand how our dedication to quality and innovation brings exceptional products to life.

Our Core Projects

Clients Love

Testimonial

We've been sourcing piping products from Watsan Engineering for several projects, and the quality has always exceeded expectations. Their team is responsive, deliveries are on time, and the products consistently meet industry standards. We highly recommend them for reliable pipe manufacturing solutions.

Ayesha Khan Procurement Manager

Working with Watsan Engineering has been a great experience. Their PVC pipes and fittings are durable, precisely manufactured, and perform exceptionally well on our construction projects. Their professionalism and commitment to quality make them a trusted long-term partner.

Muhammad Usman Civil Engineer

Watsan Engineering has consistently delivered high-quality products that perfectly match our project requirements. Their knowledgeable staff, efficient service, and dependable delivery schedule have helped us complete multiple projects without unnecessary delays.

Fatima Ali Project Coordinator

We have used Watsan Engineering's piping solutions on several commercial developments and have always been impressed with their product quality and customer support. Their attention to detail and commitment to excellence truly set them apart in the industry.

Ahmed Raza Construction Contractor

Our Latest News

Makes and Models

Engineering Excellence: A Look Inside Our Pipe Manufacturing Process

Solving 5 Common Industrial Plumbing Problems with Advanced Pipe Solutions

Beyond the Flow: Key Standards and Certifications for Industrial Pipes