PP Male Elbow

 

Item Code Description Unit Weight (g)
CFME2012 PP Male Elbow 20×1/2″ (Italian Plast) 0.040
CFME2534 PP Male Elbow 25×3/4″ (Italian Plast) 0.065
CFME251 PP Male Elbow 25×1″ (Italian Plast) 0.070
CFME3234 PP Male Elbow 32×3/4″ (Italian Plast)
CFME321 PP Male Elbow 32×1″ (Italian Plast)
CFME40114 PP Male Elbow 40×1-1/4″ (Italian Plast)
CFME50112 PP Male Elbow 50×1-1/2″ (Italian Plast) 0.270
CFME63112 PP Male Elbow 63×1-1/2″ (Italian Plast) 0.480
CFME632 PP Male Elbow 63×2″ (Italian Plast) 0.550
CFME75212 PP Male Elbow 75×2-1/2″ (Italian Plast)
CFME903 PP Male Elbow 90×3″ (Italian Plast)
CFME1104 PP Male Elbow 110×4″ (Italian Plast)

COMPRESSION FITTINGS ASSEMBLY INSTRUCTIONS

PIPE PREPARATION & CAP UNSCREW:

Cut the pipe round and square and remove the burrs; better to chamfer greater than 75mm. Unscrew the Cap to the last thread, leave it on the fitting while inserting the pipe.

PIPE INSERTION UP TO THE FIRST PIPE STOP:

Twist the pipe into the fitting through the grip ring till the first stop: the pipe has reached the O Ring. Pipe insertion up to the first pipe stop. Balance sealing system. The O Ring has two. opposite lips that allow easier pipe insertion. The right placement of the O Ring in the body round to avoid twisting. The better adaptability of the Ring towards the body and the pipe wall. (large contact pipe surface)

PIPE INSERTION UP TO THE BODY PIPE STOP:

Push the pipe through the gasket till the second stop, you have reached the pipe stop ribs of the fitting. Balancing of O Ring
The radial body site and the conical gasket are designed to keep the gasket lightly up in the site: after the pipe insertion it doesn’t reach directly the body pipe stop, it also remains a little raised from the pipe stop thanks to the internal ribs in the body.

SCREWING THE CAP:

Tighten the Cap firmly by hand or standard tool up to 20-32mm, and by standard Pipe wrench for greater than 40mm; the pipe moves to the very final body stop.

Balancing of O Ring:

By tightening the Cap it works on the thrust ring that push the O Ring, meanwhile the pipe is moving to the final stop in the body: the O Ring can deeply place in its site also moving radially and increasing its compression towards the pipe wall, as much as it’s possible in relation to the dimensional. In this way, acting on the tightening level of the Cap, it is possible to realize a system able to balance pipe defects such as undersize and ovality in standard

Description

 
Item Code Description Unit Weight (g)
CFME2012 PP Male Elbow 20x1/2" (Italian Plast) 0.040
CFME2534 PP Male Elbow 25x3/4" (Italian Plast) 0.065
CFME251 PP Male Elbow 25x1" (Italian Plast) 0.070
CFME3234 PP Male Elbow 32x3/4" (Italian Plast)
CFME321 PP Male Elbow 32x1" (Italian Plast)
CFME40114 PP Male Elbow 40x1-1/4" (Italian Plast)
CFME50112 PP Male Elbow 50x1-1/2" (Italian Plast) 0.270
CFME63112 PP Male Elbow 63x1-1/2" (Italian Plast) 0.480
CFME632 PP Male Elbow 63x2" (Italian Plast) 0.550
CFME75212 PP Male Elbow 75x2-1/2" (Italian Plast)
CFME903 PP Male Elbow 90x3" (Italian Plast)
CFME1104 PP Male Elbow 110x4" (Italian Plast)

COMPRESSION FITTINGS ASSEMBLY INSTRUCTIONS

PIPE PREPARATION & CAP UNSCREW:

Cut the pipe round and square and remove the burrs; better to chamfer greater than 75mm. Unscrew the Cap to the last thread, leave it on the fitting while inserting the pipe.

PIPE INSERTION UP TO THE FIRST PIPE STOP:

Twist the pipe into the fitting through the grip ring till the first stop: the pipe has reached the O Ring. Pipe insertion up to the first pipe stop. Balance sealing system. The O Ring has two. opposite lips that allow easier pipe insertion. The right placement of the O Ring in the body round to avoid twisting. The better adaptability of the Ring towards the body and the pipe wall. (large contact pipe surface)

PIPE INSERTION UP TO THE BODY PIPE STOP:

Push the pipe through the gasket till the second stop, you have reached the pipe stop ribs of the fitting. Balancing of O Ring
The radial body site and the conical gasket are designed to keep the gasket lightly up in the site: after the pipe insertion it doesn’t reach directly the body pipe stop, it also remains a little raised from the pipe stop thanks to the internal ribs in the body.

SCREWING THE CAP:

Tighten the Cap firmly by hand or standard tool up to 20-32mm, and by standard Pipe wrench for greater than 40mm; the pipe moves to the very final body stop.

Balancing of O Ring:

By tightening the Cap it works on the thrust ring that push the O Ring, meanwhile the pipe is moving to the final stop in the body: the O Ring can deeply place in its site also moving radially and increasing its compression towards the pipe wall, as much as it’s possible in relation to the dimensional. In this way, acting on the tightening level of the Cap, it is possible to realize a system able to balance pipe defects such as undersize and ovality in standard

DISCOVER OUR PRODUCTION LINE

Click here to watch an exclusive video tour of our state-of-the-art production line and factory. See firsthand how our dedication to quality and innovation brings exceptional products to life.

Our Core Projects

Clients Love

Testimonial

We've been sourcing piping products from Watsan Engineering for several projects, and the quality has always exceeded expectations. Their team is responsive, deliveries are on time, and the products consistently meet industry standards. We highly recommend them for reliable pipe manufacturing solutions.

Ayesha Khan Procurement Manager

Working with Watsan Engineering has been a great experience. Their PVC pipes and fittings are durable, precisely manufactured, and perform exceptionally well on our construction projects. Their professionalism and commitment to quality make them a trusted long-term partner.

Muhammad Usman Civil Engineer

Watsan Engineering has consistently delivered high-quality products that perfectly match our project requirements. Their knowledgeable staff, efficient service, and dependable delivery schedule have helped us complete multiple projects without unnecessary delays.

Fatima Ali Project Coordinator

We have used Watsan Engineering's piping solutions on several commercial developments and have always been impressed with their product quality and customer support. Their attention to detail and commitment to excellence truly set them apart in the industry.

Ahmed Raza Construction Contractor

Our Latest News

Makes and Models

Engineering Excellence: A Look Inside Our Pipe Manufacturing Process

Solving 5 Common Industrial Plumbing Problems with Advanced Pipe Solutions

Beyond the Flow: Key Standards and Certifications for Industrial Pipes